A 2016 post on this blog traced the evolution of BIM
protocols from 2003. This journey highlights the increasing importance of
structured planning for successful BIM implementation.
In the U.S., design firms utilizing AIA contracts are
mandated to incorporate AIA Document E203™–2013, the Building Information
Modeling and Digital Data Exhibit, when BIM is involved. This document, along
with companion forms G201™–2013 (Project Digital Data Protocol Form) and
G202™–2013 (Project Building Information Modeling Protocol Form), establishes a
framework for collaborative BIM planning. These documents make a robust BIM
Execution Plan a contractual requirement, not a mere option.
Globally, ISO 19650 echoes this emphasis on collaborative
planning for effective BIM implementation.
Some designers, particularly those specializing in
repetitive project types (like healthcare or housing) or working with long-term
consultant relationships, may mistakenly perceive BIM planning as superfluous.
However, this is a dangerous assumption.
- Shifting
Landscape: The rise of alternative delivery methods, such as Design
for Manufacturing and Assembly (DfMA), pushes system design further
downstream. Without a clearly defined and agreed-upon BIM Execution Plan,
there's no established baseline for interim milestones or final
deliverables. This ambiguity can lead to costly rework, delays, and
disputes.
- The
AI Factor: As AI, GIS, and Digital Twin technologies become
increasingly integrated into the design process, the importance of a
robust BIM Execution Plan becomes even more critical. These advanced
technologies thrive on structured data and clear workflows – elements that
a well-defined plan provides.
- Leadership
and Marginality: The BIM Execution Plan is not a "nerdy
exercise" but a crucial management tool. By actively participating in
the development of the BIM Execution Plan, designers demonstrate
leadership and ensure their expertise is fully integrated into the project's
success. Failing to do so risks marginalizing their role and potentially
limiting their impact on the project's outcome.
In conclusion, a well-defined and collaboratively developed
BIM Execution Plan is no longer optional – it's a contractual necessity. By
embracing this critical planning step, design firms can enhance their project
delivery, mitigate risks, and position themselves as leaders in the evolving
digital construction landscape.
#BIM, #BIMExecutionPlan, #AIAE203, #ISO19650, #ConstructionTech, #ProjectDelivery